Company · Integrated capabilities

Building, developing and completing the construction cycle.

OnlyParking approaches the car park as a complete urban infrastructure: from construction and the development of its surroundings to operation and the responsible management of materials generated during the works.

Construction · Property development · Non-hazardous waste transport

01 · Construction

Underground engineering for demanding urban car parks.

Building below ground requires a coordinated response to ground behaviour, excavation stability, nearby buildings and utilities, water control and the sequence of structural works.

For each project, the geotechnical investigation and design determine the retaining and foundation systems, excavation stages, instrumentation and control measures. These provide the basis for coordinating the structure, waterproofing, drainage, services, access and safety, with operation and maintenance considered from the outset.

Concrete structure of the Puerta del Mar car park during construction
Puerta del Mar · CádizHistorical construction archive. Structure during construction.
Aerial view of the excavation and construction of the Plaza de San José car park in Cádiz
Plaza de San José · CádizHistorical construction archive. Excavation seen from above.

Technical archive · Underground construction

Specialist equipment for critical construction stages

These historical photographs show drilling and excavation machinery, reinforced concrete structural work and working platforms where water is present. In urban projects of this kind, ground retention, deformation control, excavation-face stability and water management are interdependent decisions. Addressing them requires equipment and construction sequences adapted to the ground and the constraints of each site.

Large-scale machinery for retaining and excavation work on an urban site
Retaining and excavation equipment on an urban site
Reinforced concrete structure of an underground car park under construction
Reinforced concrete structure across several underground levels
Detail of a helical drilling auger used in civil engineering
Helical auger drilling
Construction machinery working in an excavation with water present
Working platform in an excavation with water present

02 · Property development

A new piece of the city around Plaza Mayor.

On residential plot R1 in the Plaza Mayor–Mercado del Carmen area of Huelva, the proposal combines homes, commercial activity and mobility alongside a new public space.

The Basic Design provides for two- and three-bedroom homes arranged around four residential entrances, with a mezzanine garage and storage rooms. Proposed specifications include an insulated building envelope, thermally broken joinery and energy solutions focused on comfort; final specifications will be set out in the development's technical and sales documentation.

39planned homes
5.030,17 m²floor area counted for planning purposes
30planned garage spaces
41planned storage rooms

Figures from the Basic Design and R1 information dossier (August 2026). Layout, floor areas and specifications are subject to planning permission, detailed design and final documentation.

03 · Non-hazardous waste transport

Separate at source, transport with traceability and prioritise recovery.

Onlyparking, S.L. is registered with the Regional Government of Andalusia as a non-hazardous waste carrier (T02; registration GRU012043) for European Waste Catalogue codes 17 05 04, soil and stones, and 17 01 07, non-hazardous mixtures of concrete, bricks, tiles and ceramics.

On our sites, management starts in the working area: we identify and separate waste fractions, document their origin and select the appropriate destination route for each material. Where soil and stones meet the applicable requirements, they may be recovered in another construction project or used in authorised, technically suitable filling operations. Material that cannot be recovered is delivered to an authorised facility with the required documentation and acceptance.

01

On-site classification

Separation by waste fraction and European Waste Catalogue code, avoiding mixtures that make subsequent recovery more difficult.

02

Controlled transport

Protected loads, identification of origin and destination, and movement documentation under the applicable rules.

03

Verified destination

Recovery or delivery to an authorised waste manager or facility, never informal dumping or filling without the required conditions.

White tipper truck with a covered trailer travelling on a road
Transport with a protected load
White tipper truck unloading soil
Unloading soil

Let's talk

A project perspective that extends into operation.

If you need to develop a car park or transform an urban asset, we can assess the full scope: construction, services, management and user experience.